+
  • a8.png

Wall BOX & Cordset Co-Line


Classification:

New Energy High Power Euipment


Key Words: Fixture

Function: Labeling the shell, installing studs, installing connectors, threading/pressing, installing connectors, installing PCBA&O-type terminals, installing nuts*3, inserting signal lines, base pre-installed O-ring foam, base installation/ Compression, high pressure/EOL detection, sealant/CCD detection, manual cover/electric cylinder compression, glue curing, sealing test, labeling/inspection/packaging
Control: Omron PLC /IPC/CCD

Product Description


Function: Labeling the shell, installing studs, installing connectors, threading/pressing, installing connectors, installing PCBA&O-type terminals, installing nuts*3, inserting signal lines, base pre-installed O-ring foam, base installation/ Compression, high pressure/EOL detection, sealant/CCD detection, manual cover/electric cylinder compression, glue curing, sealing test, labeling/inspection/packaging
Control: Omron PLC /IPC/CCD

 

 

Highly customized: customized according to the specific needs of customers.

Multi-functional performance: it can realize automatic production of "parts assembly, welding, dispensing, labeling, locking screws, testing, packaging" and other tasks.

Improve efficiency and quality: it can improve production efficiency and ensure the stability of product quality. A piece of equipment can replace 2-10 human workers, and the cost can be recovered in about a year.

High-precision and high-speed: Using custom-developed control systems and advanced components to achieve high-precision and high-speed automated operations, it can perform tasks quickly and accurately.

Easy to integrate and operate: Upgrade and development are considered at the beginning of the design, and it can be seamlessly integrated with other automation equipment and information systems to achieve overall automation and data management.

Previous Page

Tesla 3PH

Next Page

Contact Us

+86
  • +86 CN
%{tishi_zhanwei}%